Stormwater Compliance & Level 2 Response for California Data Center Component Manufacturer

Project Details:

KERAMIDA provides ongoing Qualified Industrial Stormwater Practitioner (QISP) services for a precision sheet metal manufacturer specializing in data center infrastructure components. The engagement supports multiple advanced manufacturing facilities in Northern California under the state's Industrial General Permit (IGP).

Industrial Stormwater Compliance

Our services include:

  • Routine compliance evaluations

  • Sampling support and results interpretation against Numeric Action Levels (NALs)

  • Ad Hoc reporting through SMARTS

  • Annual comprehensive facility compliance evaluations and required training

  • Annual report preparation

  • Stormwater Pollution Prevention Plan (SWPPP) updates

Level 2 Exceedance Response Action

KERAMIDA completed a Level 2 Exceedance Response Action (ERA) evaluation following Numeric Action Level exceedances for aluminum and iron. This included:

  • An on-site assessment to identify areas and activities contributing to the exceedances

  • Evaluation of existing Best Management Practices (BMPs)

  • Identification of improvements to reduce pollutant levels

KERAMIDA prepared the required Level 2 Technical Report, updated the facility SWPPP, and supported implementation of the recommended measures.


Related Services:

Related Industries: